From Inquiry to Field Operation

A clear, controlled cooperation process for oilfield equipment, well-service packages, drilling solutions, spare parts, and oilfield chemicals.

Response
Within 24h

Standard Terms
30 / 70

Remote Support
Within 48h

Supply Scope
Turnkey

Integrated Supply

Equipment, auxiliaries, spares, and chemicals in one package.

Verified Manufacturing

Qualified suppliers with documented production and testing controls.

Export Compliance

API, CE, ATEX, and ISO documentation matched to project requirements.

Global Delivery

Inspection, export preparation, shipping, and handover coordination.

Seven-Stage Cooperation Timeline

Transparent progress at every stage

Timelines vary by configuration, certification, destination, and order volume. Your project manager provides milestone updates from requirement confirmation through after-sales support.


  1. 01

    Inquiry & Requirement Confirmation

    We review the application, operating environment, technical parameters, target capacity, required certifications, destination, commercial terms, and delivery expectations. For complete systems, we also identify auxiliary equipment, recommended spare parts, training, and site-condition requirements.

    • Application and formation conditions
    • Technical specification and capacity
    • Destination standards and certification
    • Budget, Incoterm, and target schedule

    Estimated Time

    Within 24 hours


  2. 02

    Technical Proposal & Quotation

    Oasis Petrotech compares qualified manufacturing options and prepares a technically aligned proposal. The quotation defines scope of supply, exclusions, optional items, unit pricing, production lead time, warranty, inspection method, packing, and shipping terms.

    Standard payment is 30% T/T deposit and 70% balance before shipment. Depending on project risk and order value, an at-sight letter of credit or other agreed secured terms may be considered.

    Estimated Time

    2-5 business days


  3. 03

    Production & Milestone Tracking

    After contract confirmation and deposit receipt, the selected factory releases the production plan. We track material readiness, fabrication, assembly, critical-component installation, intermediate inspection, finishing, and factory testing. Progress updates can include photographs, videos, and milestone reports.

    Material readiness
    Assembly updates
    Mid-production check
    Factory acceptance test

    Estimated Time

    30-120 days

    Product dependent


  4. 04

    Quality Control & Final Inspection

    Before release, the order is checked against the approved specification and contract. Inspection covers model and configuration, appearance, functional parameters, nameplates, accessories, spare-parts quantities, documentation, and seaworthy packing. Remote video inspection is available, while SGS or Bureau Veritas inspection can be arranged for major orders.

    Certification files may include API 7K, API Q1, API 6A, CE, ATEX Zone II, ISO, or project-specific compliance documents where applicable.

    Estimated Time

    2-7 business days


  5. 05

    Export Preparation & Shipping

    Following approval and balance payment, we coordinate export packing, customs documentation, container loading or breakbulk preparation, port delivery, customs declaration, and carrier handover. Shipping options are selected according to cargo dimensions, destination, urgency, and cost.

    Typical ocean transit is 20-60 days. Total transit may vary because of route availability, transshipment, port congestion, customs, weather, and destination handling.

    Preparation

    7-15 business days

    Plus transit time


  6. 06

    Delivery & Handover

    We provide shipping-document copies for destination preparation and monitor the shipment through arrival. The customer or appointed customs broker completes import clearance and inland delivery unless destination services are included. Handover includes document verification, package-count confirmation, and receipt inspection guidance.

    Any visible transport damage or package shortage should be recorded immediately with photographs and noted on the carrier’s receipt.

    Estimated Time

    3-10 business days

    After port arrival


  7. 07

    Commissioning & After-Sales Support

    Our support continues after delivery through remote troubleshooting, operating guidance, maintenance recommendations, technical document coordination, and spare-parts supply. A recommended spare-parts package can be shipped with the equipment to reduce downtime.

    • Remote response within 48 hours
    • Quarterly operating follow-up
    • Spare-parts identification and supply
    • Remote training and troubleshooting

    Support Period

    Ongoing

    Per warranty terms

Containers prepared for international shipping

Commercial & Logistics Control

A transaction structure designed to reduce uncertainty

Clear payment milestones

Standard terms are 30% deposit to begin procurement and production, followed by 70% balance after final approval and before shipment.

Order-specific procurement

Equipment is sourced and configured against the confirmed contract, avoiding unsuitable inventory and keeping technical scope aligned with the customer’s application.

Inspection before release

Equipment, accessories, documentation, and packing are checked before shipment. Independent inspection is available when required.

Destination-ready coordination

Our team coordinates shipping details and document preparation with the customer, freight forwarder, customs broker, and manufacturer.

Delivery Document Checklist

Documents prepared for a smoother handover

The final document package is adapted to the product, Incoterm, destination regulations, certification scope, and contract requirements.

Business documents prepared for project delivery

Commercial Invoice

Final commercial values, buyer details, Incoterm, and product description.

Packing List

Package count, dimensions, gross weight, net weight, and packing details.

Bill of Lading

Carrier-issued transport document or agreed equivalent for the shipment mode.

Certificate of Origin

Issued where requested and supported by destination or contractual requirements.

Inspection Record

Final inspection report, photographs, videos, or third-party report when agreed.

Factory Test Report

Applicable function, pressure, performance, or factory acceptance test records.

Certification Package

Applicable API, CE, ATEX, ISO, material, or conformity documentation.

Manuals & Drawings

Operating manuals, maintenance instructions, layouts, and relevant technical drawings.

Warranty Statement

Warranty coverage, start date, exclusions, claim process, and support contacts.

Spare-Parts List

Included items, recommended operational spares, and identification references.

Quality & Support Commitments

Built around reliability, compliance, and uptime

01

Specification Control

Contract specifications and approved configurations guide purchasing, production, testing, and final inspection.

02

Seaworthy Packing

Export packing is selected according to equipment type, dimensions, sensitivity, route, and handling conditions.

03

Warranty Coverage

Typical coverage is 12 months after arrival or 6 months after installation, subject to the final contract.

04

Responsive Support

Remote technical response within 48 hours, with spare-parts coordination and ongoing operating follow-up.

Professional project team workspace

Start Your Project

Tell us what you need

Share your application, technical parameters, destination, required certifications, quantity, and target delivery date. Our team will respond within one business day.

  • Technical review and equipment matching
  • Complete commercial quotation
  • Estimated production and shipping schedule




Request a quotation