Integrated Global Supply Operations
0 ? get_the_title($page_id) : ”;
if (!is_string($page_title_raw) || trim($page_title_raw) === ”) {
$page_title_raw = ‘Supply Chain & Fulfillment’;
}
$page_title = esc_html($page_title_raw);
?>
= $page_title ?>
From qualified factory sourcing and three-stage inspection to export packaging and international delivery, Oasis Petrotech coordinates every critical step from China to your project site.
- Quality Gates
- 3
- Remote Response
- 48h
- Export Markets
- 4
- Load Verification
- 100%
-
01
Supplier Qualification -
02
Production Control -
03
Final Inspection -
04
Export Packaging -
05
Global Delivery
Partner Factory Network
Specialized Manufacturing Across China
Our network combines heavy-equipment manufacturing, certified coiled-tubing production, oilfield chemical supply, and centralized export coordination.
Core Supply Capabilities
Coiled Tubing Systems
Truck-mounted and skid-mounted CTU packages, injectors, reels, and pumping units with API, CE, and ATEX options.
Heavy Oilfield Equipment
Fracturing, cementing, workover, plunger-pump, wellhead, and natural-gas equipment from qualified manufacturers.
Oilfield Chemicals
Drilling, completion, and acidizing-fluid solutions coordinated alongside equipment and consumable requirements.
Backup Supplier Control
Alternative production sources and schedule buffers reduce exposure to factory delays and component shortages.
Three-Stage Quality Control
Quality Built Into Every Milestone
Inspection records, test results, nameplate data, accessories, documentation, and export packing are checked before shipment release.
-
01
Incoming Inspection
Materials and purchased components are verified before entering production.
- ✓Material certificates and specification check
- ✓Dimensions, appearance, and quantity verification
- ✓Critical component traceability review
-
02
In-Process Inspection
Production progress and key assembly points are monitored against the approved specification.
- ✓Production schedule milestone tracking
- ✓Assembly, welding, and process checks
- ✓Mid-production photo and video reporting
-
03
Pre-Shipment Inspection
Equipment is released only after final tests, documents, accessories, and packing are confirmed.
- ✓Functional and factory acceptance testing
- ✓Nameplate, manuals, and accessory audit
- ✓Remote video, SGS, or BV inspection options
Warehouse & Staging
Flexible Capacity for Project Cargo
A project-based warehouse model provides scalable staging for complete equipment packages, spare parts, chemicals, and consolidated multi-supplier orders.
- Storage Model
- Scalable 3PL
- Container Staging
- 40 ft HC
- Critical Spares Target
- 48 Hours
- Outbound Verification
- 100%
Consolidated Order Staging
Equipment, accessories, documentation, and spare-parts packages are grouped before final loading.
Export Packaging Standards
Protected for Long-Distance Transport
Packaging plans are selected according to equipment weight, corrosion risk, handling method, destination regulations, and ocean-transit conditions.
Heavy-Equipment Securing
Load-distribution planning, wheel chocks, steel bracing, rated tie-downs, and lifting-point identification.
Seaworthy Export Crating
Reinforced cases, protected contact surfaces, clear handling marks, and ISPM 15-compliant timber where applicable.
Moisture & Corrosion Protection
VCI protection, desiccants, waterproof wrapping, sealed openings, and corrosion prevention for ocean transit.
-
Marine-Grade Protection -
Bilingual Shipping Marks -
Photo Documentation -
Container Load Check
Port to Project Site
Coordinated freight, documentation, tracking, and delivery support.
Logistics Partner Network
Flexible Routing Through Global Carriers
Carrier and forwarder options are selected per project according to cargo type, port access, destination, schedule, compliance requirements, and total landed cost.
Carrier availability and routing are subject to shipment requirements and are arranged on a project-by-project basis.
Export Documentation
Commercial, packing, origin, and technical document coordination.
Route Optimization
Port, sailing, transshipment, and destination options compared before booking.
Shipment Visibility
Milestone updates from factory pickup through port arrival.
Special Cargo Handling
Containerized, oversized, heavy-lift, and hazardous cargo planning.
One Coordinated Supply Chain
Ready to simplify your next equipment shipment?
Share your equipment list, destination port, required certifications, and delivery schedule. Our team will coordinate sourcing, inspection, packing, and freight planning.